This week’s restoration update was to fit the Oil reservoir,
coolent reservoir, airbox and battery box.
The oil reservoir fits very snuggly inside the frame and to
get it in required the removal of the inner mudguard and the top shock bolt. With
these removed I could lift the back end of the bike up to make the gap between
the rear tyre and the frame larger and get the oil tank in to the frame via this
gap. Once the tank was in I could re-fit the top shock bolt and then the rear
mudguard which the oil tank bolts to it.
Next in was the air box, first connect the airbox to the
carb and then bolt the air box to the frame. On the other side the battery box
can go in with the coolent reservoir bolting to the bottom battery box mount.
The oil res was then plumbed in to the oil pump and the coolent res water pipe
routed roughly where it had to go.
Next the rear indicator mounts were de-greased, sanded, painted
with primer and satin black paint.