Monday 16 April 2018

My bike: Restoration update, the middle of the bike!

This week’s restoration update was to fit the Oil reservoir, coolent reservoir, airbox and battery box.

The oil reservoir fits very snuggly inside the frame and to get it in required the removal of the inner mudguard and the top shock bolt. With these removed I could lift the back end of the bike up to make the gap between the rear tyre and the frame larger and get the oil tank in to the frame via this gap. Once the tank was in I could re-fit the top shock bolt and then the rear mudguard which the oil tank bolts to it.

Next in was the air box, first connect the airbox to the carb and then bolt the air box to the frame. On the other side the battery box can go in with the coolent reservoir bolting to the bottom battery box mount. The oil res was then plumbed in to the oil pump and the coolent res water pipe routed roughly where it had to go.

Next the rear indicator mounts were de-greased, sanded, painted with primer and satin black paint.

Next job I fitted the rear cowling and checked alignment of the rear light in the bodywork, and its all looking good.






Lastly I stripped and straightened the front indicator stay, unfortunately one side has a broken tab. This part although cheap is a no longer available item, so it is going to a friend of mine who will fabricated a new tab and weld it on.





No comments:

Post a Comment