This week was a little slower, but progress was still made.
Job 1 was to rebuild the riders foot pegs with new rubbers, but one of the steel pegs was so rusted I think it will need replacing so this job was put on the back burner.
Job 2 was to re-finish the radiator mounts as I was not happy with them, these were flatted back with wet and dry and painted with primer, ready for satin black that I need to buy another tin off.
Lastly my bolts came back from the electroplaters, the finish is really impressive and has saved a ton of money in replacement bolts. Silver and gold are Zink and the black is Nickle.
No comments:
Post a Comment